EVALUATION OF ACCURACY AND UNCERTAINTY OF ISO 13503-2 PROPPANT TESTING
|
2021 |
Makashova, Galina |
NEW ANALYTICAL APPROACH TO OPERATIONAL ASSESSMENT OF FRACTURED WELL PRODUCTIVITY WITH VARIABLE PERMEABILITY
|
2021 |
Yudin, Evgeniy Viktorovich |
THE INTERPRETATION TECHNIQUE OF RATE TRANSIENT ANALYSIS DATA IN FRACTURED HORIZONTAL WELLS
|
2021 |
Urazov, Ruslan Rubikovich |
EVALUATING EFFICIENCY OF MULTILATERAL PRODUCING WELLS IN BOTTOM WATER-DRIVE RESERVOIR WITH A GAS CAP BY DISTRIBUTED FIBER-OPTIC SENSORS AND CONTINUOUS PRESSURE MONITORING
|
2021 |
Maltsev, Andrei Konstantinovich |
7-INCH CASING WHILE DRILLING CWD WITH RETRIEVABLE BOTTOM HOLE ASSEMBLY BHA
|
2021 |
Usmanov, Askhat Radikovich |
CONTINUOUS IMPROVEMENT: ROTARY STEERABLE SYSTEM WITH ELECTROMAGNETIC TELEMETRY AS APPROACH TO REDUCE WELL TIME
|
2021 |
Rakhmangulov, Farit |
DEVELOPMENT AND SUCCESSFUL FIELD TRIAL OF RETRIEVABLE, INSTRUMENTED & TANDEM DOWNHOLE ISOLATION VALVE RIT-DIV SYSTEM
|
2021 |
Amangeldiyeva, Diana |
TECHNO-ECONOMIC ASSESSMENT OF THE EQUIPMENT FOR PRODUCTION CARBON BLACK FROM APG
|
2021 |
Dimitriev, Anton Sergeevich |
RECOVERY OF LITHIUM FROM ASSOCIATED WATER OF OIL AND GAS DEPOSITS
|
2021 |
Gavrilov, Anton Yurievich |
COMPREHENSIVE ANALYSIS OF THE GEOLOGICAL AND GEOPHYSICAL DATA IN THE STUDY OF THE UPPER MIOCENE TURBIDITE SYSTEMS OF THE NAM CON SON BASIN, VIETNAM
|
2021 |
Kurianova, Mariia |
PRACTICAL APPLICATION OF INTEGRATED SIMULATION TECHNOLOGIES FOR ASSET DEVELOPMENT AND SURFACE FACILITIES DESIGN OF GAS FIELDS
|
2021 |
Zhuravlev, Mikhail |
FRACTURING EXPERIENCE OF TYUMENSKAYA AND VIKULOVSKAYA FORMATIONS: APPLICATION OF NOVEL LOW-VISCOSITY FRACTURING FLUIDS AS AN ALTERNATIVE TO GUAR-BASED FLUIDS
|
2021 |
Loskutov, Konstantin Yurievich |
STIMULATION OF TIGHT FORMATION IN KAZAKHSTAN BY CHELATE BASED TREATMENTS FLUIDS
|
2021 |
Nazari, Rasoul |
GELLED ACID VS. SELF-DIVERTING SYSTEMS FOR CARBONATE MATRIX STIMULATION: AN EXPERIMENTAL AND FIELD STUDY
|
2021 |
Folomeev, Alexey Evgenievich |
INTERFACIAL TENSION MEASUREMENTS AT RESERVOIR CONDITIONS USING X-RAY IMAGING
|
2021 |
Pletneva, Vera |
THE USE OF A SENSOR MODULES SYSTEM FOR MEASURING DRILLING PARAMETERS IN A BIT, SIGNIFICANTLY REDUCES THE CONSTRUCTION TIME OF WELLS IN EASTERN SIBERIA
|
2021 |
Rebrikov, Andrey Alexandrovich |
CONSTRUCTION OF A MULTIPURPOSE EXPLORATION WELL IN THE JURASSIC DEPOSITS SUBSEQUENT TRANSFER TO PRODUCTION ENABLED BY METAL EXPANDABLE BARRIER INSTALLED BEHIND THE CASING
|
2021 |
Lebedev, Ivan Valentinovich |
FROM COMPLETION DESIGN TO EFFICIENCY ANALYSIS OF INFLOW CONTROL DEVICE: COMPREHENSIVE APPROACH FOR AICD IMPLEMENTATION FOR THIN OIL RIM FIELD DEVELOPMENT EFFICIENCY IMPROVEMENT
|
2021 |
Solovyev, Timur |
DYNAMIC MODELING OF THE GAS DISCHARGE OF A MINE IN THE KARAGANDA COAL BASIN UNDER HIGH UNCERTAINTY USING A MULTIPLE REALIZATION
|
2021 |
Bigeldiyev, Asfandiyar |
RISK MANAGEMENT APPROACH: DRILLING AND COMPLETION PROJECTS
|
2021 |
Ruzhnikov, Alexey |