Use of Cut-and-Cover Method for Pipeline Installation in Underground Freight Transportation

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Pipelines Conference (2017 : Phoenix, Ariz.) Pipelines 2017 ; 3: Construction and rehabilitation
1. Verfasser: Ashoori, Taha (VerfasserIn)
Weitere Verfasser: Najafi, Mohammad (VerfasserIn), Tabesh, Amir (VerfasserIn), Korky, Seyed Mohammad Sadegh Jalalediny (VerfasserIn), Mohammadi, Mohammadreza Malek (VerfasserIn)
Pages:2017
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2017
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Failing to Flawless in a Day: Pre-Chlorinated Pipe Bursting Invigorates Arlington Water Utilities Main Replacement Program 2017 Allen, J.
ASCE Innovation Award Winner: Sandwich Construction Carbon Pipe 2017 Ehsani, Mo
An Analysis of Soil Hauling Operations for Tunneling and Pipeline Installation 2017 Korky, S. Jalalediny
Comparison of Carbon Footprint of Trenchless and Open-Cut Methods for Underground Freight Transportation 2017 Tavakoli, Razieh
Development and Use of Robotic Equipment for Large Diameter Pipe Recoating 2017 Chism, Jess
CIPP Applications for Pressure Pipeline in High-Profile Area 2017 Lancaster, Ian
Design-Build of 48-Inch Water Main Interconnect in Downtown Miami 2017 Maristany, Agustin
Managing a Major Scope Change and Unforeseen Conditions during the Performance of a Hot Tap and Plugging Operation on a 90-Inch Concrete Cylinder Pipe to Enable Highway Improvements without Service Interruption 2017 Herckis, Charles
Case Studies in Trench Shoring and Landslide Repair in Difficult Terrain 2017 Mislinski, Corey
DC WATER at Work: Less Cutting to Mitigate Geo-Structural Risks 2017 Bian, Steve
Design/Build for Trenchless Rehabilitation—Find and Fix: Lessons for Success 2017 Kunay, Jonathan E.
Construction Phase—Large Diameter Pipeline Seismic Retrofit Mitigates Landslide Hazard 2017 Baune, Darren
State Transportation Agencies Acquiring Trenchless Technologies for Their In-House Operations: A Case Study of ODOT Acquiring HAB Machine 2017 Adamtey, Simon
Performance Modeling of Wastewater Collection Networks Using Multi-Proactive Renewal Analysis 2017 Ganjidoost, Hadi
Development of a Trenchless Renewal Strategy for Process and Fire Main Failures at an Industrial Facility 2017 Knight, M. A.
Increasing Pipeline Pressure Rating Using CFRP Liners: A Case Study on an NTMWD Pipeline 2017 Engindeniz, Murat
Looking for Simplified Design Models for Non-Circular Liner Design: Moving Beyond WRc Type II Sewer Design Methodologies for the North American Market 2017 Braun, Adam
Advanced Applications for HDPE Pipe with New PE-RT 2017 Long, H. W.
Manufacturing of Emergency Repair Pipe for 210” Irrigation Siphon 2017 DeGrande, Vic
WSSC Breaks Its Record in CFRP Lining of PCCP in One Outage 2017 Engindeniz, Murat
Alle Artikel auflisten