Incorporating Digital Engineering Tools into Project Design

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AREMA Annual Conference (2020 : Online) Proceedings of the 2020 Annual Conference ; Volume 2
1. Verfasser: Smith, G. (VerfasserIn)
Weitere Verfasser: Mohebi, M. (VerfasserIn)
Pages:2020
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2020
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Field Validation of Longitudinal Rail Load Distribution Model 2020 Liu, S.
So You Want to Build a Railroad? An Environmental Clearance and Permitting Story 2020 Keller, K. K.
Noise - and Vibration - Mitigating Track Design Elements: Case Studies from Recent Projects around the Globe 2020 Digerness, J.
A Monumental Undertaking to a Once-In-A- Lifetime Bridge Failure for a Shortline Railroad 2020 Davis, G. A.
Identifying High Risk Areas in Vast Distributed Rail Networks to Support Decision Making through Predictive Analytics 2020 Einbinder, D.
Continuous Monitoring of Wheel/Rail Forces during In-Service Freight Operations Has Led to a Successful Performance-Based Track Maintenance Plan 2020 Liu, Y.
ACSES-based Positive Train Control - Past, Present, and Future 2020 Ehrenberger, M. J.
Railroads in the Age of Disruption (PowerPoint only) 2020 Hatch, A. B.
Timber Crosstie Spike Failures: Field Loading Demands, Modelling Results, and Mitigation Considerations (PowerPoint only) 2020 Trizotto, M.
Student Program (PowerPoint only) 2020 Dean, A.
Phased Construction for Modernization of Union Pacific's Los Angeles Transportation Center Intermodal Facility (LATC) Los Angeles, California 2020 Karow, A.
A Risk Management Tool to Evaluate Adjacent Track Accidents on Shared-Use Rail Corridors 2020 Lin, C.
Railroad Rights ICCTA Preemption, the Shift in Regulators' Understandings, and the Impact on Critical Railroad Project Schedules 2020 Williams, M. A.
Trinity Railway Express Bridge Replacement - Threading the Needle Between Clearance Requirements 2020 Bateman, R.
Metra Bridge Z-100 over the Fox River Using ABC Techniques and innovative Design Details to Overcome Site Access Challenges 2020 Kirchner, L.
Effect of Tie Condition Distribution on Life Expectancy of Wood Crosstie 2020 Zarembski, A. M.
Emergency Rebuild of Norfolk Southern Railway's Grand River Bridge Near Brunswick, MO 2020 Neprud, E. W.
Artificial Intelligence-Aided Prediction of Broken Rail Occurrence Using Railroad Big Data 2020 Liu, X.
Reduction of Train Derailments Based on Gage Face Friction Management 2020 Soares, S.L.
Understanding Influences on Student Pursuit of Railway Education and Careers 2020 Evans, E. L.
Alle Artikel auflisten