Analysis on The System Interaction of VE in Public Works
|
2011 |
Saito, Koji |
The Application of a Value Assurance System to Oil & Gas Development Projects
|
2011 |
Mattu, Guido |
A Brave New World: Public-Private Partnerships, Design-Build Delivery, and Value Engineering
|
2011 |
Sloggy, John E. |
DFA Worker Allocation Improves Value of Lean Product Development
|
2011 |
Rosales, Rogelio Guzman |
Establishing Direction for Success In Manufacturing, Government and Construction Value Studies
|
2011 |
Cook, Thomas M. |
The Function Wheel
|
2011 |
Rude, Jeff |
Improving the Performance of a Highway Construction Project Using a Systematic VM Approach
|
2011 |
Yu, Jingyu |
Risk Analysis & VE for CMAR Projects
|
2011 |
Hoekstra, Renee L. |
Popularizing Value Engineering for Wider Applications
|
2011 |
Aggarwal, Pawan K. |
A Streamlined Value Planning Process for Small Proscriptive Projects on a Budget
|
2011 |
Johnson, Paul |
Role of Sponsorship in Capturing VE Benefits
|
2011 |
Orlean, Robert |
Understanding the Advantages and Potential Pitfalls of Quantifying Performance Measures
|
2011 |
Prager, Robert |
VE Introduction Plan and Future View of Environment
|
2011 |
Ahn, Choong-Heui |
Energy Simulation In Facility VE Studies – A Paradigm Shift
|
2011 |
Kwong, Benson |
Effective VE Achievement that Utilizes Expert Choice
|
2011 |
Shin, Chan-Ho |
A Guide for Idea Generation and Creativity Using Function Analysis
|
2011 |
Berawi, Mohammed Ali |
How Can TRIZ Improve the Outcome of a Value Engineering Workshop
|
2011 |
Gaikwad, Sanjay |
How VA Improved the Automation Strategy at the City of Calgary
|
2011 |
Rabbi, Mushtaq |
Revealing Hidden Economic Externalities In Major Projects with Value Methodology
|
2011 |
McPhillips, Munsell |
“ROCKY ROAD” - No Match for VE Team
|
2011 |
Knoles, Warren |