THE DRILLING CONTRACTORS ASSOCIATION (DCA-EUROPE)A EUROPEAN ORGANIZATION FOR QUALITY AND EDUCATION IN HDD

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International No-Dig Conference and Exhibition (37. : 2019 : Florenz) 37th International No-Dig Conference and Exhibition (International NO-DIG 2019)
1. Verfasser: Stoelinga, Jorn (VerfasserIn)
Pages:37
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2020
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
NEW TECHNICAL SOLUTIONS FOR THE BURIAL OF DISTRIBUTION NETWORKS: BENEFITS AND REASONS WHY 2020 Venturi, Luca
NOVEL BUSINESS MODELS IN SUPPORT OF TRENCHLESS CITIES 2020 Rogers, Chris
EXPERIMENTAL CHARACTERIZATION OF MINI-TRENCHES ON ROADPAVEMENTS 2020 Corradini, Alessandro
REHABILITATION OF A 10 KM LONG ASBESTOS-CEMENT DRINKING WATER TRUNKMAIN IN SPAIN WITH FLEXIBLE RELINING TECHNOLOQGY 2020 Lamazares, Jorge
AWWA WATERMAIN REHABILITATION INITIATIVES 2020 Knight, Mark
QUALITY CONTROL FACTORS OF CIPP CONSTRUCTION MANAGEMENT FOR WATER MAIN REHABILITATION 2020 Chen, Wei-Cheng
REHABILITATION OF A 3000 MM WATER SUPPLY LINE UNDER OPERATING CONDITIONS IN BUENOS AIRES 2020 Hölterhoff, Jens
NO-DIG RENOVATION OF PRESSURE PIPELINES, RE-CONNECTION TECHNIQUES AND CASE STUDIES 2020 Barbosa, Firmino Pires
INNOVATION FOR THE ENVIRONMENT: THE EXPERIENCE OF MARCHE MULTISERVIZI S.P.A. 2020 Bruni, Niko
EXPERIMENTAL STUDY ON PULLBACK LOADS FOR STEEL PIPELINES INSTALLED BY HORIZONTAL DIRECTIONAL DRILLING 2020 Faghih, Ashkan
HDD DRILLING IN HARD AND HARDEST ROCK IN EUROPE - EXAMPLES OF JOB SITES 2020 Bayer, Hans-Joachim
HDD MARSDIEP CROSSING BETWEEN DEN HELDER AND TEXEL, LENGTH = 4,600 M 2020 Fengler, Ernst
REPLACING A PENSTOCK PIPE USING DIRECTIONAL DRILLING : CHRONICLE OF A NON-STANDARD JOBSITE 2020 Feldmann, Dominique
SMART TECHNOLOGIES FOR THE ENHANCEMENT OF PRODUCTIVITYAND,DIGITAL INTEGRATION AND SAFETY IN HDD PROJECTS 2020 Westende, Jasper Van 'T
THE CORNEGLIANO LAUDENSE NATURAL GAS STORAGE PROJECT: HDD AS SOLUTION FOR PIPELINE INSTALLATION IN URBAN AREAS 2020 Nisii, V.
THE DEVELOPMENT OF REAL-TIME DETECTION AND WIRELESS TRANSMISSION SYSTEM OF DRILLING PARAMETERS IN HDD REAMING HOLE 2020 Xuming, Zhu
ELECTRIFICATION OF DIRECTIONAL DRILLING MACHINES FOR SUSTAINABLE TRENCHLESS EXCAVACATIONS 2020 Savi, Raffaele
INNOVATIVE MONITORING OF RAILWAY TRACKS DURING TRENCHLESS CROSSINGS 2020 Butterworth, Jack
A MICROTUNNEL WITH A VERY LITTLE RADIUS FOR A BIG PIPELINE 2020 Lazzarini, Ugo
TUNIS NAVIGATION E-POWER PIPE. PRECISE GUIDANCE OF SMALL DIAMETER TUNNELING MACHINES 2020 Hähnle, Torben
Alle Artikel auflisten