EVALUATING THE ECONOMIC EFFECTIVENESS OF DECONSTRUCTION ACTIVITIES FOR A FACILITY: A CASE STUDY
|
2020 |
Pushkar, Akash |
THE USE OF RELIABILITY ANALYSIS IN THE BID DECISION-MAKING PROCESS
|
2020 |
Ghodoosi, Farzad |
ARTIFICIAL NEURAL NETWORK DETERIORATION ASSESSMENT MODEL FOR BRIDGES IN MISSOURI
|
2020 |
Ali, Gasser |
CITY-SCALE ENERGY MODELING TO ASSESS IMPACTS OF EXTREME HEAT ON ELECTRICITY CONSUMPTION AND PRODUCTION USING WRF-UCM MODELING WITH BIAS CORRECTION
|
2020 |
Jahani, Elham |
ROBUST RESERVE CAPACITY PLANNING FOR POST-DISASTER HEALTH-CARE FACILITIES THROUGH INTELLIGENT PLANNING UNITS (IPUS)
|
2020 |
Choi, Juyeong |
THE EFFECT OF SOCIAL CAPITAL ON POST-DISASTER INFORMAL RECONSTRUCTION IN PUERTO RICO
|
2020 |
Poleacovschi, Jessica Talbot. Cristina |
SELF-HEALING CONCRETE: A CRITICAL REVIEW
|
2020 |
Guo, Shannon |
LIFE-CYCLE ASSESSMENT OF FULL-SCALE MEMBRANE BIOREACTOR AND TERTIARY TREATMENT TECHNOLOGIES IN FRUIT PROCESSING INDUSTRY
|
2020 |
Chu, Tong |
EFFECTS OF RELATIVE BED COARSENESS AND BLOCKAGE RATIO ON LOCAL SCOUR AROUND BRIDGE ABUTMENTS
|
2020 |
Wu, Peng |
A NEURAL NETWORK-BASED APPLICATION FOR AUTOMATED DEFECT DETECTION FOR SEWER PIPES
|
2020 |
Yin, Xianfei |
SUSTAINABLE DESIGN OF REINFORCED CONCRETE FLAT-PLATE BUILDINGS BASED ON COST, EMBODIED ENERGY, AND CARBON FOOTPRINT
|
2020 |
Noman, Ahmed |
LEADING INDICATORS FOR SAFETY MANAGEMENT: UNDERSTANDING THE IMPACT OF PROJECT PERFORMANCE DATA ON SAFETY PERFORMANCE
|
2020 |
Mohamed, Emad |
ANALYZING HAZARDOUS INTERACTIONS ON CONSTRUCTION JOBSITES USING SOCIAL NETWORK ANALYSIS
|
2020 |
Alomari, Kasim |
EXPONENTIAL RANDOM GRAPH MODELING: A PROMISING TOOL FOR CONSTRUCTION SAFETY RESEARCH
|
2020 |
Alomari, Kasim |
A LANDMARK CONCRETE ARCH BRIDGE WITH AN INNOVATIVE APPROACH: POST- TENSIONED TIE GIRDERS
|
2020 |
Curzio, Luiza |
ANALYSIS OF PREFABRICATED CONSTRUCTION: PRODUCTIVITY, BENEFITS, RISKS & APPLICATIONS IN CANADIAN PERSPECTIVES
|
2020 |
Safiuddin, Md. |
SAVING REFINANCING COST: THE OPTION VALUE OF REVENUE RISK-SHARING MECHANISMS IN TRANSPORTATION PUBLIC-PRIVATE PARTNERSHIPS (P3) PROJECTS
|
2020 |
Liang, Yunping |
APPLICATION OF FUZZY ANALYTIC HIERARCHY PROCESS IN FRONT-END PLANNING
|
2020 |
Kedir, Nebiyu |
CONSTRUCTION STAKEHOLDERS - PERCEPTION TOWARD THE SUCCESS FACTORS OF CONSTRUCTION PROJECTS
|
2020 |
Al-Bayati, Ahmed |
EFFECT OF SUPERABSORBENT POLYMER ON MITIGATING DAMAGES AT STEEL BAR-CONCRETE INTERFACE
|
2020 |
Ojarestaghi, Seyed Sina Mousavi |