Dolphin Restraint System for the Precast Concrete Floating Berth at the Haines Ferry Terminal
|
2019 |
Goodnight, Chad |
Design, Testing, and Construction of a Wave Energy Absorbing Quay Wall
|
2019 |
Wesson, Mauricio A. |
Drone: The New Point and Shoot Camera; Using Drones to Enhance Waterfront Inspection and Design
|
2019 |
Marcotte, David |
Establishing a Rational Inspection Criteria for Composite Materials Used in Waterfront Structures
|
2019 |
Iversen, Rune |
Leveraging BIM Tools to Coordinate and Design a Navy Pier Extension
|
2019 |
Schilling, T. J. |
Load Forecasting for Automated Terminals: A Summary of the Middle Harbor Terminal Power Requirements
|
2019 |
Sayler, Kent |
Land Reclamation and Settlement of Reclaimed Land for New Ports
|
2019 |
Leung, Chun F. |
Performance Based Seismic Retrofit Solutions for Wharf Preservation
|
2019 |
Yao, Sam |
MILCON P-547 Power and Propulsion Facility
|
2019 |
Young, William |
Port of San Francisco Seawall - Geotechnical Approach for Seismic Vulnerability Optimization
|
2019 |
Ugalde, Jose |
Port of Long Beach Marine Maintenance Dock Facilities at Pier D, Berth 48, Project
|
2019 |
Aguilar, Joel |
Precast, Prestressed Concrete Floating Berth at the Haines Ferry Terminal
|
2019 |
Firat, Yeliz |
Proposed Pipe Pile Strain Limits for ASCE 61-19
|
2019 |
Harn, Robert |
Scour Protection at Modern Cruise Terminals: Case Studies of Cruise Terminals 1 and 3, Port Canaveral, FL
|
2019 |
Clarke, S. |
Seawall Movement and Piling Design at the San Francisco Waterfront
|
2019 |
Liu, Di |
Seismic Analyses for San Francisco Port-Wide Risk Assessment
|
2019 |
Galbraith, J. |
Seismic Design of Pile-Supported Wharves: Effect of New Steel Strain Limits in ASCE 61-19
|
2019 |
Frandsen, Helge |
Wharf Structure Design Consideration of Pier E Redevelopment Project at the Port of Long Beach
|
2019 |
Jaradat, Omar |
Wings over Washington Foundation Design
|
2019 |
Klusmeyer, Louis A. |
Wharf Upgrade Considerations for Large Low Profile Cranes
|
2019 |
Bhimani, Arun |