Land Reclamation and Settlement of Reclaimed Land for New Ports

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:PORTS (Veranstaltung : 15. : 2019 : Pittsburgh, Pa.) PORTS 2019: Port engineering
1. Verfasser: Leung, Chun F. (VerfasserIn)
Weitere Verfasser: Lam, James P. W. (VerfasserIn), Salim, El F. (VerfasserIn), Chian, Siau C. (VerfasserIn)
Pages:2019
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2019
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
CFD Wave Loading and Response Analysis for Large Interconnected Float Systems 2019 Monfort, C. L.
Combined Kinematic and Inertial Seismic Analysis of Marine Structures 2019 Galbraith, J. A.
Design Challenges - B Jetty Reconstruction, Canadian Forces Base in Esquimalt, British Columbia, Canada 2019 Atukorala, Upul
Effect of Moored Vessels on the Dynamic Response of Marginal Wharves Subjected to Ground Motions 2019 Villamizar-Gonzalez, J. Nicolas
Extending the Service Life of Mooring Cells 2019 Usselton, Zachary J.
Geotechnical and Structural Challenges: New Seattle Multimodal Terminal at Colman Dock Project 2019 Bayrak, M. Birkan
Influence of Dynamic Behavior of Soft Clay on Seismic Pier Response at the Port of San Francisco 2019 Serna, Benjamin
Precast Construction or Upgrade/Expansion of Two Operating Solid Bulk Terminals in Colombia 2019 Sircar, Jyotirmoy
Seismic Analysis and Design of Ferry Plaza for the Downtown San Francisco Ferry 2019 Bozorgzadeh, Azadeh
Seismic Design Standards for Nonstructural Components and Nonbuilding Structures in Motems 2019 Goel, Rakesh K.
The Port of Los Angeles Seismic Code Update for Container Wharves 2019 Lim, Angel
The Port of Los Angles Wilmington Waterfront Promenade: “A Window to the Waterfront" 2019 Cisneros, Hugo
Centreport Wellington Post-Earthquake Recovery of Thorndon Container Wharf Operations 2019 Boyce, Alistair
Upcoming Changes to ASCE/COPRI 61-19 Chapter on Ancillary Components 2019 King, Brett W.
Upgrade of Berths 226-236, Container Wharf Terminal at the Port of Los Angeles 2019 Lim, Angel
A Look into Premature Failure of Vertically Welded Pipe Piles 2019 Teeden, Matthew L.
Pile-Supported Quay Submitted to Successive Earthquake and Tsunami Actions 2019 Reis, Cláudia
Berths 214-220 Redevelopment Construction Lessons Learned at the Port of Los Angeles 2019 Han, E.
Emergency Wharf Repair at North Embarcadero, Port of San Diego, CA 2019 Martinez, Matthew N.
Increasing Lift Height and Improving Ship to Shore Gantry Cranes inside an Active Container Yard 2019 Stehmeyer, Edward H. III
Alle Artikel auflisten