Optimal Operational Control of Water Pipeline Systems Using Real-Time Scheduling Framework

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Pipelines Conference (2019 : Nashville, Tenn.) Pipelines 2019 ; 1: Planning and design
1. Verfasser: Mahmoud, Abdulrahman A. Bin (VerfasserIn)
Weitere Verfasser: Piratla, Kalyan R. (VerfasserIn)
Pages:2019
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2019
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
A New Regional Wastewater System: 16 Communities, $325M, and 90 Miles of Forcemain 2019 Weninger, Stephan
Sanitary Conveyance and Treatment Improvements - Western Regional: Progressive Design-Build Project 2019 Miller, Renee
Challenging 72-Inch Dual Pipe Relocations through Nob Hill for San Diego County Water Authority 2019 Fountain, Brent J.
Design of CIPP Pressure Liners Using the HDB Method 2019 Knight, Mark A.
Designing an Economical FRP System for Pipeline Rehabilitation 2019 Sever, V. Firat
Development of a Framework for Design and Installation of a New Lining Material for Water Pipeline Renewal 2019 Mohammadi, Mohammadrza Malek
Scarborough Trunk Watermain - Design Challenges and Pipe Material Selection 2019 Alberto, S.
Route Selection Based on a Weighted Ranking Analysis 2019 Triebel, George
Soil-Pipe Interaction Characterization for Seismically-Induced Longitudinal Permanent Ground Displacements 2019 Rajah, Sri
Shifting to a Monetized Quantitative Approach for Risk Analysis Using Property Damages 2019 Ganjidoost, Amin
Nashville's Largest Water Line Project from Concept to Service in 24 Months 2019 Toosi, Cyrus
Extending the Life of a 35-Year-Old Critical Water Supply System under Severe Time and Environmental Restrictions 2019 Beck, Andrew
Case Study: Using a Risk-Based Model to Take the Guesswork Out of Corrosion 2019 Lammerts, Sean
Early Environmental Planning for Pipeline Projects Can Save a Lot of Green 2019 Ellenberger, Christine
Axial Connection Force Capacity Required for Buried Pipelines Subjected to Seismic Permanent Ground Displacement 2019 Wham, Brad P.
State Required Water Asset Management Plans: Lessons Learned from Hundreds of AMPs from Michigan 2019 Baird, Gregory M.
Pipe Manufacturers' Role in Design/Build Pipeline Projects 2019 Bardakjian, Henry H.
Condition Assessment of Two 21-Ft Diameter Flexible Steel Pipelines: A Case Study at the Central Arizona Project 2019 Geisbush, Jim
Managing a Multitude of Large Diameter Alternative Pipeline Routes in an Urban Area 2019 Paris, Kerilyn M.
That’s Confusing! Suggestions for Preparing Concise Design Guidelines for Pipeline Projects 2019 Beieler, Roger
Alle Artikel auflisten