Over 5 Miles of Horizontal Directional Drills of Sanitary Force Main in Largo, FL

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Pipelines Conference (2019 : Nashville, Tenn.) Pipelines 2019 ; 2: Condition assessment, construction, and rehabilitation
1. Verfasser: Turnage, Ben (VerfasserIn)
Weitere Verfasser: Tseng, Randy (VerfasserIn)
Pages:2019
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2019
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
72-Inch Wastewater Point Repair in Dallas, Texas 2019 Paris, Marty S.
Trenchless Repair of Coastal Water Authority’s 60-Inch PCCP Pipeline along Independence Parkway 2019 Henry, G.
City of Baton Rouge: Integration of Condition Assessment Information Systems 2019 Kennedy, Courtney
Developing a Focused CIP to Optimize Resources Using Pipeline Renewal Models 2019 Baranowski, David
A Comparison of Computational and Experimental Results of 54-Inch PCCP Repaired with Carbon Fiber Reinforced Polymer under Live Load 2019 Hajali, Masood
Mains, Trains, and Automobiles: Utilizing Fort Worth's Risk Assessment Data to Drive Sanitary Sewer Rehabilitation 2019 Kercho, Josh
Mitigation of Issues Raised during Construction of Trunk Sewer Rehabilitation Project 2019 Martire, Chris
Not Failing on My Watch: Tucson Water’s Proactive Approach to Pipeline Reliability 2019 Acosta, Paul
Pardee Tunnel Inspection and Condition Assessment 2019 Moughamian, Raffi
Pipeline Ovality Assessment at Low Internal Pressures 2019 Farrow, Kenny T.
Reliability Assessment of Corroded Water Distribution Networks 2019 Mazumder, Ram K.
South Florida Aging Infrastructure: Force Main Condition Assessment 2019 Griffin, Jerome
The Balance between Technology and Human Data Acquisition for Condition Assessment Studies for Water and Wastewater Facilities: Have We Reached the Tipping Point? 2019 Villalobos, Jose L.
To Buy or Not to Buy - Deciding Whether to Pre-Purchase Pipe 2019 Engelskirchen, Eric
AWWA C305 - A New Standard for CFRP Renewal and Strengthening of PCCP 2019 Zarghamee, Mehdi S.
Extending the Life of Metallic Pipes - Designing CP Systems in Houston 2019 McCray, Benjamin C.
Siphons Galore: Crossing under a Lake, a Hill, and a Highway by Designing Inverted Siphons for King County's Mercer Enatai Project 2019 Nelson, Ben
Application of GIS/Geomatics to Areas Affected by Subsiding Land and Rising Sea: Simulation of Risks and Identification of At-Risk Infrastructure 2019 Tewari, Sanjay
Impact of Tunnel Boring Machine Advance Rate for Pipeline Construction Projects 2019 Serajiantchrani, Ramtin
Tunneling the Largest Water Line for the City of Houston 2019 Salinas, Michael A.
Alle Artikel auflisten