12-Inch Water Line Horizontal Directional Drill across Hunting Bayou Using Cartridge Method

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Pipelines Conference (2019 : Nashville, Tenn.) Pipelines 2019 ; 2: Condition assessment, construction, and rehabilitation
1. Verfasser: Kirby, Christine H. (VerfasserIn)
Weitere Verfasser: Hernandez, Eric I. (VerfasserIn), Hunter, Anh H. (VerfasserIn), D'Silva, Samson (VerfasserIn)
Pages:2019
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2019
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Avoiding Tunnel Vision in Large Diameter Sewer Rehabilitation 2019 Bell, Robert E. Jr.
Case Study from Trenchless Rehabilitation of 60-Inch Residuals Transfer Main at East Side Water Treatment Plant 2019 Barton, Wayne
Concrete Pipe Leak Repair without Service Interruption 2019 Peng, Tao
Life Cycle Cost Analysis for Decision Making in Collection System Rehabilitation 2019 Beaudet, Bevin A.
Pushing the Envelope - Rehabilitation of Non-Circular Sewers Up to 2.7 m (9') High with Reinforced Cured in Place Pipe 2019 Macey, Chris
Rehabilitation of a Critical High-Pressure Transmission Main underneath and in the Vicinity of a Major Highway 2019 Obzejta, Roman
Replacement of Raw Water Transmission Line with Fused Pipe System Provides Stable Water Supply to Historical City 2019 Hay, Scott
Which Pipe First? Using Evidence-Based Condition Assessment and Desktop Modeling to Optimize Pipe Replacement 2019 Gill, Nimarta
Crossing That Bridge Later: Installing a Critical Water Pipeline over an Existing Bridge without Modifications 2019 Brick, William
Design-Build Project Administration: Case Studies from Water Utilities in the U.S. Southwest/Pacific Region 2019 Feghaly, Jeffrey
Mitigating the Risk of Failure during Construction Live Loading on Prestressed Concrete Cylinder Pipe (PCCP) 2019 Alavinasab, Ali
A Study of Life Extension of Two Prestressed Concrete Cylinder Pipelines 2019 Zarghamee, Mehdi S.
Using Cathodic Protection (CP) Retrofits to Extend Useful Water Main Life for Cast and Ductile Iron Mains 2019 Macey, Chris
24-Inch Force Main by HDD for Dallas Water Utilities 2019 Bryan, James E.
HDD Design for Construction Ocean Outfall 2019 Camp, Craig
Taming the Multi-Stakeholder Hydra: Permitting, Design, and Tunneling a Sewer across the Dulles International Airport and the Metrorail Silverline 2019 Belk, Chris
Cast Iron Pipe Rehabilitation with CFRP and CIPP in a Nuclear Power Generation Station 2019 Jimenez, Tomas T.
A Comprehensive Condition Assessment of a Critical Water Main 2019 Livingston, Bryon
DC Water New Jersey B Street 12-to-18-Foot Diameter Trunk Sewer Geopolymer Rehabilitation during Live Dry Weather Flow 2019 Bian, Steve
Meeting Construction Challenges with Trenchless Technology 2019 Morley, Catherine L.
Alle Artikel auflisten