A 60-Year History of the Efficacy of Polyethylene Encasement of an Iron Pipe Installation in an Aggressive Soil Environment

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Pipelines Conference (2019 : Nashville, Tenn.) Pipelines 2019 ; 2: Condition assessment, construction, and rehabilitation
1. Verfasser: Barrios, Dirk (VerfasserIn)
Weitere Verfasser: Horn, L. Gregg (VerfasserIn)
Pages:2019
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2019
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Cast Iron Pipe Rehabilitation with CFRP and CIPP in a Nuclear Power Generation Station 2019 Jimenez, Tomas T.
A Comprehensive Condition Assessment of a Critical Water Main 2019 Livingston, Bryon
DC Water New Jersey B Street 12-to-18-Foot Diameter Trunk Sewer Geopolymer Rehabilitation during Live Dry Weather Flow 2019 Bian, Steve
Meeting Construction Challenges with Trenchless Technology 2019 Morley, Catherine L.
Ashley Interceptor Rehabilitation - Phase 8 "Surprises and Successes" tor North Charleston Sewer District 2019 Reigart, James C.
One Liner to Rule Them All: King County Interbay 48-Inch Sewer Force Main Rehabilitation Story 2019 Lindsey, Steve
Opportunistic Pipeline Condition Assessment: More Bang for Your Capital Buck! 2019 Stegemann, Jason
Rehabilitation of 75-Year-Old Cast Iron Water Line in Historic District 2019 Henry, G.
Thorny Details of the Rose Canyon Trunk Sewer Rehabilitation 2019 Raines, Casey
Ultrasonic Measurements for Condition Assessment of Prestressed Concrete Cylinder Pipe 2019 Villalobos, Salvador
Challenges and Lessons Learned of Commissioning Large Diameter Watermains 2019 Wildschut, Eric
Challenges Associated with the Construction of 40 Miles of Regional Water Transmission Pipeline and the Associated Pump Station Facility 2019 Harrison, Jennifer
2-Layer Polyethylene Extruded Factory-Applied Pipe Corrosion Coating 2019 Thomas, Samuel
Breathing 20 Years of Life into Expired PCCP Segments - How a Regional Medical Center Was Able to Save Their Pipeline 2019 Wagner, Amber
Jim Creek Siphon Expansion Joint Evaluation 2019 Dennis, Laura
12-Inch Water Line Horizontal Directional Drill across Hunting Bayou Using Cartridge Method 2019 Kirby, Christine H.
Analysis of Microtunnel Data Confirms Geostrata for a Curved Microtunnel in the City of Brantford 2019 Bauman, Troy
72-Inch Wastewater Point Repair in Dallas, Texas 2019 Paris, Marty S.
Trenchless Repair of Coastal Water Authority’s 60-Inch PCCP Pipeline along Independence Parkway 2019 Henry, G.
City of Baton Rouge: Integration of Condition Assessment Information Systems 2019 Kennedy, Courtney
Alle Artikel auflisten