Replacement of Raw Water Transmission Line with Fused Pipe System Provides Stable Water Supply to Historical City

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Pipelines Conference (2019 : Nashville, Tenn.) Pipelines 2019 ; 2: Condition assessment, construction, and rehabilitation
1. Verfasser: Hay, Scott (VerfasserIn)
Weitere Verfasser: Plumlee, Alan (VerfasserIn), Hernandez, Saul (VerfasserIn), Garvia, Shawn (VerfasserIn)
Pages:2019
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2019
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
A Modern Solution for an Old Problem - Utilizing both CIPP and CFRP for Aerial Pipeline Rehabilitation 2019 Wagner, Amber
Clean Water Nashville: System Renewal through Rehab and Replacement 2019 Martin, Kimberly
Condition Assessment of Portland, Oregon, Water Bureau's Three Primary Supply Mains 2019 Hess, Jeremiah
Condition Prediction of Sanitary Sewer Pipes 2019 Mohammadi, Mohammadrza Malek
Condition Assessment and Repair Prioritization of a Large Diameter Pipeline System 2019 Williams, Andrew F.
Distribution Pipe Measurement to Inform Pipe Replacement Plans 2019 Millner, Chad
Development of a Renewed Approach to Internal Reinstatement of Services in CIPP Lined Water Mains 2019 Bontus, George
Effective Condition Assessment: Washington Suburban Sanitary Commission's Industry Leading PCCP Management Program 2019 Carpio, Karem
Looking into the Void: Condition Assessment with Pipe Penetrating Radar 2019 Ekes, Csaba
Narragansett Bay Commission Rehabilitation of Large Diameter Brick Sewer with Geopolymer Mortar 2019 Goulet, Meg
Pipe Bursting Success in a Developed Neighborhood 2019 Tarantino, Jeffrey J.
Remaining Life Analysis for Wastewater and Force Main Pipes for Long-Term Life Cycle Cost Decision Support 2019 Uslu, Berk
Survey Level Condition Assessment of Bar-Wrapped and Steel Pipe 2019 Engindeniz, Murat
Fill It Up - Getting Water to Port Miami in Time for Mega Cruise Ship Arrivals 2019 Caban, Ken
DC Water at Work: Optimal Risk Management of Construction Close to Buried Linear Assets 2019 Bian, Steve
Sequoia Aqueduct RCCP Hot Tap 2019 McLeod, Marshall
A 60-Year History of the Efficacy of Polyethylene Encasement of an Iron Pipe Installation in an Aggressive Soil Environment 2019 Barrios, Dirk
Corrosion Protection of Ductile Iron Pipe for a Large Diameter Transmission Main Project 2019 Bolen, Tyler
DigIndy Tunnel System Pleasant Run PR02-DV-1 2019 Lewis, Maceo R. IV
Over 5 Miles of Horizontal Directional Drills of Sanitary Force Main in Largo, FL 2019 Turnage, Ben
Alle Artikel auflisten