Life Cycle Cost Analysis for Decision Making in Collection System Rehabilitation

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Pipelines Conference (2019 : Nashville, Tenn.) Pipelines 2019 ; 2: Condition assessment, construction, and rehabilitation
1. Verfasser: Beaudet, Bevin A. (VerfasserIn)
Weitere Verfasser: Tobey, Bruce (VerfasserIn), Harder, Scott E. (VerfasserIn)
Pages:2019
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2019
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Avoiding Tunnel Vision in Large Diameter Sewer Rehabilitation 2019 Bell, Robert E. Jr.
Case Study from Trenchless Rehabilitation of 60-Inch Residuals Transfer Main at East Side Water Treatment Plant 2019 Barton, Wayne
Concrete Pipe Leak Repair without Service Interruption 2019 Peng, Tao
Life Cycle Cost Analysis for Decision Making in Collection System Rehabilitation 2019 Beaudet, Bevin A.
Pushing the Envelope - Rehabilitation of Non-Circular Sewers Up to 2.7 m (9') High with Reinforced Cured in Place Pipe 2019 Macey, Chris
Rehabilitation of a Critical High-Pressure Transmission Main underneath and in the Vicinity of a Major Highway 2019 Obzejta, Roman
Replacement of Raw Water Transmission Line with Fused Pipe System Provides Stable Water Supply to Historical City 2019 Hay, Scott
Which Pipe First? Using Evidence-Based Condition Assessment and Desktop Modeling to Optimize Pipe Replacement 2019 Gill, Nimarta
Crossing That Bridge Later: Installing a Critical Water Pipeline over an Existing Bridge without Modifications 2019 Brick, William
Design-Build Project Administration: Case Studies from Water Utilities in the U.S. Southwest/Pacific Region 2019 Feghaly, Jeffrey
Mitigating the Risk of Failure during Construction Live Loading on Prestressed Concrete Cylinder Pipe (PCCP) 2019 Alavinasab, Ali
A Study of Life Extension of Two Prestressed Concrete Cylinder Pipelines 2019 Zarghamee, Mehdi S.
Using Cathodic Protection (CP) Retrofits to Extend Useful Water Main Life for Cast and Ductile Iron Mains 2019 Macey, Chris
24-Inch Force Main by HDD for Dallas Water Utilities 2019 Bryan, James E.
HDD Design for Construction Ocean Outfall 2019 Camp, Craig
Taming the Multi-Stakeholder Hydra: Permitting, Design, and Tunneling a Sewer across the Dulles International Airport and the Metrorail Silverline 2019 Belk, Chris
72-Inch Wastewater Point Repair in Dallas, Texas 2019 Paris, Marty S.
Trenchless Repair of Coastal Water Authority’s 60-Inch PCCP Pipeline along Independence Parkway 2019 Henry, G.
City of Baton Rouge: Integration of Condition Assessment Information Systems 2019 Kennedy, Courtney
Developing a Focused CIP to Optimize Resources Using Pipeline Renewal Models 2019 Baranowski, David
Alle Artikel auflisten