YARD CRANE SCHEDULING WITH RESHUFFLES IN AN IMPORT CONTAINER BLOCK

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International Conference on Computers & Industrial Engineering (46. : 2016 : Tientsin) 46th International Conference on Computers & Industrial Engineering 2016 (CIE46) ; Volume 1
1. Verfasser: Zheng, F. (VerfasserIn)
Weitere Verfasser: Man, X. (VerfasserIn), Liu, M. (VerfasserIn), Chu, F. (VerfasserIn)
Pages:46
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2017
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
STUDY OF CREATIVE MANAGEMENT PATH BASED ON PRODUCT INNOVATION DESIGN PROCESS 2017 Wang, J.
DESIGN OF REMOTE ALARM SYSTEM FOR WAREHOUSE FIRE 2017 Du, Y.
CUSTOMER SATISFACTION OF BIKE SHARING SYSTEMS AND AN ARTIFICIAL BEE COLONY ALGORITHM FOR BIKE REPOSITIONING PROBLEM 2017 Feng, X.
MULTI-OBJECITVE SLOTTING OPTIMIZATION PROBLEM OF WAREHOUSING SYSTEM 2017 Hu, Y.
CLASSIFYING AND SCREENING THE ACTIVE FACTORS WITH SEQUENTIAL BIFURCATION IN SIMULATION EXPERIMENTS 2017 Liu, L.
SERVICE-ORIENTED TRACEABILITY PLATFORM FOR PACKAGED FOODS SUPPLY CHAIN 2017 Liu, G.
THE RESULTS OF RESEARCH ON NEURO-INDUSTRY ENGINEERING: THE NEW STAGE OF IE 2017 Xu, X.
A SURVEY OF HUB LOCATION PROBLEM FOR THE NEW NETWORK STRUCTURE RESEARCH 2017 Zhang, K.
THE FORECASTING OF CENTRAL TECHNOLOGY PROBLEM AND DEVELOPMENT DIRECTION - A STUDY BASED ON THE TEXT DATA FROM SCIENTIFIC RESEARCH FOUNDATION 2017 Zhou, Z Li. T.
RETAILER’S STRATEGY CHOICE FOR DEFECTIVE ITEMS UNDER TEMPORARY PRICE REDUCTION: INCURRING DEFECT SALES RETURN OR INCREASING THE SCREENING RATE 2017 Zhu, G.
EARTHQUAKE MEDICAL RELIEF CONCEPTUAL MODEL DESIGN AND EFFICIENCY EVALUATION 2017 Peng, B.
ACCURACY EVALUATION METHOD FOR INTERMITTENT DEMAND FORECASTS 2017 Canda, A.
PORT TRUCK SCHEDULING ON A DEDICATED TRANSPORTATION ROUTE AT A CONTAINER TERMINAL 2017 Zheng, F.
OPTIMIZED TOOL PATH PLANNING FOR FIVE-AXIS FLANK MILLING OF RULED SURFACE USING GEOMETRIC DECOMPOSITION STRATEGY AND MULTI-POPULATION HARMONY SEARCH ALGORITHM 2017 Yi, J.
RESEARCH ON COUPLING SCHEDULING OF QUAY CRANE DISPATCH AND CONFIGURATION IN THE CONTAINER TERMINAL 2017 Liang, C.
TEMPORAL PARTITIONING OPTIMIZATION FOR DYNAMICALLY RECONFIGURABLE ARCHITECTURE 2017 Abdallah, F.
A SWITCHING PROBLEM FOR SMART FACTORY CONSIDERED PRODUCTION, DUE DATE AND QUALITY 2017 Sun, J.
CENSORED DATA ORIENTED ESTIMATION OF THE CHANGE POINT IN THE INFANT PERIOD OF A BATHTUB CURVE BY MAXIMUM LIKELIHOOD ESTIMATION 2017 Wei, Y.
EFFECT OF PHASE I ESTIMATION ERROR ON THE PHASE II MONITORING OF SIMPLE LINEAR PROFILE WITH WITHIN-PROFILE AUTOCORRELATION 2017 Zhang, Y.
MINING EMPIRICAL AND TEMPORAL MEDICAL DATA FOR MULTISCALE DECISION-MAKING 2017 Yu, H.
Alle Artikel auflisten