205 THE MULTI-TERMINAL VERTEX SEPARATOR PROBLEM: POLYHEDRAL ANALYSIS AND BRANCH-AND-CUT

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International Conference on Computers & Industrial Engineering (45. : 2015 : Metz) 45th International Conference on Computers & Industrial Engineering 2015 (CIE45) ; Volume 2
1. Verfasser: Cornaz, Denis (VerfasserIn)
Weitere Verfasser: Magnouche, Youcef (VerfasserIn), Mahjoub, Ali Ridha (VerfasserIn), Martin, Sébastien (VerfasserIn)
Pages:45
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2016
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
149 A STUDY ON DESIGN OF VISUAL MANAGEMENT SYSTEM FOR IMPROVING ITS PERFORMANCE 2016 Murata, Koichi
51 ROBUST OPTIMIZATION TO DESIGN A DYNAMIC CELLULAR MANUFACTURING SYSTEM INTEGRATING GROUP LAYOUT AND WORKER ASSIGNMENT 2016 Kia, Reza
71 IMPLEMENTING PID CONTROL FOR ADJUSTABLE SERVICE-RATE QUEUEING SYSTEM SIMULATIONS 2016 Babin, Paul
281 RECENT HYBRID METAHEURISTICS FOR MULTIOBJECTIVE SCHEDULING 2016 Gen, Mitsuo
282 HYBRIDIZATION OF MODIFIED CUCKOO SEARCH AND GENETIC ALGORITHM FOR RELIABILITY OPTIMIZATION PROBLEMS 2016 Yun, Youngsu
283 MODELING AND ANALYSIS OF THE CHARGING INFRASTRUCTURE ALLOCATION FOR A MULTIPLE-ROUTE SERVICE DYNAMIC WIRELESS CHARGING TRANSPORTATION SYSTEM USING A GENETIC ALGORITHM 2016 Lee, Min Seok
212 MATHEMATICAL FORMULATIONS FOR THE UNRELATED PARALLEL MACHINES WITH PRECEDENCE CONSTRAINTS 2016 Abdel-Jabbar, Mohammed-Albarra Hassan
108 A BI-OBJECTIVE MODEL FOR A CELLULAR MANUFACTURING SYSTEM INTEGRATING INTRA-CELL LAYOUT AND PROCESSING ROUTE RELIABILITY 2016 Nejatbakhsh, Yousef
190 AWCC-TECHNOLOGY OF SPACE-TIME BIFURCATION ANALYSIS TO RISK ASSESSMENT IN WEATHER-DEPENDENT INDUSTRIES 2016 Kolokolov, Yury
251 WIND DATA COLLECTION FOR POTENTIAL ANALYSIS AND ELECTRICITY GENERATION CASE STUDY IN NORTHWESTERN COAST OF SENEGAL 2016 Bilal, Boudy Ould
168 A SIMULATION-OPTIMIZATION APPROACH FOR MANAGING THE SALES AND OPERATIONS PLANNING IN THE AUTOMOTIVE INDUSTRY 2016 Lim, Lâm Laurent
272 FRAMEWORK AND MODEL FOR BUILDING EFFECTIVE INFORMATION SYSTEMS PROJECT TEAMS 2016 Khayat, Ghada El
57 APPLICATION OF HYBIRD ALGORITHM TO JOINT DECISION MAKING IN HINTERLAND BARGE TRANSPORT PLANNING 2016 Feng, Fan
164 NEW MODEL FOR THE ROBUST VEHICLE ROUTING PROBLEM WITH UNCERTAIN TRAVEL TIME 2016 Wu, Lei
302 ON THE KNAPSACK PROBLEM UNDER MERGING OBJECTS' CONSTRAINTS 2016 Grange, Aristide
150 EVALUATING THE ADAPTATION OF A DWELLING TO A DISABLED PERSON: A GRAPH-BASED 2016 Bouzoubaa, Yahya
66 INVESTIGATION OF VISUAL MANAGEMENT CASES IN CONSTRUCTION BY AN ANALYTICAL FRAMEWORK FROM MANUFACTURING 2016 Murata, Koichi
135 STABILITY MEASURES FOR A STOCHASTIC MULTI-LEVEL JOB SCHEDULING PROBLEM WITH DAILY WORKING HOUR 2016 Joo, Byung Jun
246 IMPROVING THE COMPLEXITIES OF FPTAS FOR SCHEDULING AND ROUTING PROBLEMS 2016 Levner, Eugene
45 A PSEUDO-POLYNOMIAL SIZE FORMULATION FOR 2-STAGE 2-DIMENSIONAL KNAPSACK PROBLEMS 2016 Furini, Fabio
Alle Artikel auflisten