09022 - How Not to Perform a Failure Analysis
|
2009 |
Nixon, Randy |
09032 - The Customer May Not Always Be Right, However, They Are Always the Customer
|
2009 |
Spotten, Russell L. |
09040 - Infrared Spectroscopy As a Failure Analysis Tool for Coatings
|
2009 |
Weldon, Dwight |
09047 - Mechanical and Environmental Evaluation of Two Commercial Internal Coatings Used in a 5-inch Drill Pipe
|
2009 |
Song, Fengmei |
09043 - Coatings Used in Conjuction with Cathodic Protection - Shielding vs Non-shielding Pipeline Coatings
|
2009 |
Norsworthy, Richard |
09051 - External Corrosion Control of Northern Pipelines Influence of Construction Conditions on the Performance of Coatings
|
2009 |
Papavinasam, Sankara |
09542 - Field Evaluation of Cathodic Protection Remote Monitoring Systems at Oil Facilities
|
2009 |
Bukhamsin, Abdulhameed A. |
09053 - Corrosion of 316 Ti Motor-pump Casings in Deep Water Wells Due to Welding Defects
|
2009 |
Al-Madani, Fawzi S. |
09066 - Mooring chains - Extent of Drain from ICCP System and Sacrificial CP System
|
2009 |
Green, Lene Marita |
09070 - Cathodic Protection Potential Distribution Simulation for Pipeline Buried in Discontinuous Permafrost
|
2009 |
Du, Yanxia |
09068 - Comparison Between Computer Model Predictions and Survey Data of Interactions Between a FPSO and Subsea Cathodic Protection System
|
2009 |
Adey, Robert A. |
09006 - Evaluation & Performance of Chemical Surface Treatments for Maintenance
|
2009 |
Sharman, Stuart |
09007 - Reliability on Coating Pull-Off Adhesion Strength Test
|
2009 |
Baek, Y. H. |
09002 - Single Pack, High Performance, Low VOC, Finish
|
2009 |
Schwob, Emmanuelle |
09008 - Controlling the Components of Calcareous Deposit to Protect Steel Structures from ALWC with DC and Pulse Current
|
2009 |
Tu, Khoi |
09012 - Advancements in High Performance Zinc Epoxy Coatings
|
2009 |
Pedersen, Lars Thorslund |
09045 - Pipeline Integrity Restoration
|
2009 |
Saleem, Mohamed A. |
09052 - Evaluation of a Coal Tar Epoxy Coating Performance for Prestressed Concrete Cylinder Pipe of the Great Man-made River Project (GMRP) Pipe Lines in Libya
|
2009 |
Arfan, Saad A. Sr. |
09050 - Relevance of Cathodic Disbondment Test for Evaluating External Pipeline Coatings at Higher Temperatures
|
2009 |
Papavinasam, Sankara |
09545 - Interference of an Impressed CP System with an Adjacent Sacrificial CP System and Its Mitigation
|
2009 |
Busba, Ezeddin R. |