Towards a new model of industrial performance improvement for SMEs a case study of TPM implementation in an industrial SME

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of process management and benchmarking
1. Verfasser: Elwardi, Badr (VerfasserIn)
Weitere Verfasser: Meddaoui, Anwar (VerfasserIn), En-Nhaili, Ahmed (VerfasserIn), Mouchtachi, Ahmed (VerfasserIn)
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2019
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
An improvement heuristic for permutation flow shop scheduling 2019 Nailwal, Kewal Krishan
Measuring the efficiency of community colleges using super efficiency approach for the case of non-discretionary factors in data envelopment analysis with sensitivity analysis 2019 Taleb, Mushtaq
Optimisation of WEDM process parameters during machining of HCHCr steel using TOPSIS method 2019 Sahoo, Sarat Kumar
Optimal sequencing of part families and configuration selection for process improvement in reconfigurable manufacturing system 2019 Mittal, Kamal Kumar
Simulation analysis of multi-node manufacturing system under design and scheduling strategies 2019 Kumar, Rajeev
Organisational and inter-organisational competencies for supply chain integration 2019 Vankireddy, Krishnapriya
Optimal reserve inventory from output of one machine to input of two machines when inter-arrival breakdown is a random variable 2019 Nandakumar, C. D.
A study on M/G/1 preemptive priority retrial queue with Bernoulli working vacations and vacation interruption 2019 Rajadurai, P.
Designing and planning a sustainable supply chain network considering economic aspects, environmental impact, fixed job opportunities and customer service level 2019 Taheri-Moghadam, Alireza
Hybrid genetic algorithm for multi-objective flow shop scheduling problem with sequence dependent setup time : parameter design using Taguchi's robust design method 2019 Viswanath, Anjana
Metaheuristic algorithms for the generalised cell formation problem considering machine reliability 2019 Nasiri, Mohammad Mahdi
Two levels of storage model for deteriorating items, stock dependent demand and partial backlogging with both rented warehouses 2019 Tayal, Shilpy
Project behaviour in different types of project management organisations : a system dynamics approach 2019 Alkadeem, Reem
Prioritisation and selection of non-traditional machining processes and their criteria using analytic hierarchy process approach 2019 Talib, Faisal
An experimental investigation to optimise injection moulding process parameters for plastic parts by using Taguchi method and multi-objective genetic algorithm 2019 Kumar, Deepak
The relationship between workplace spirituality, job satisfaction and job performance 2019 Sony, Michael
Quantifying the influence of FMS on the productivity of a firm 2019 Dixit, Sandhya
Towards a new model of industrial performance improvement for SMEs : a case study of TPM implementation in an industrial SME 2019 Elwardi, Badr
Solving a multi-manned assembly line balancing problem in a Pareto sense 2019 Chutima, Parames
Big data and privacy : a legal perspective and comparative study of the USA and India 2019 Rautdesai, Rupal
Alle Artikel auflisten