Modeling and solving the multi-period disruptions scheduling problem on urban networks

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Project management and scheduling
1. Verfasser: Coco, Amadeu A. (VerfasserIn)
Weitere Verfasser: Duhamel, Christophe (VerfasserIn), Santos, Andréa Cynthia (VerfasserIn)
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2020
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Project management and scheduling 2020 Caramia, Massimiliano
Project portfolio selection and scheduling optimization based on risk measure : a conditional value at risk approach 2020 Dixit, Vijaya
Elucidation of IS project success factors : an interpretive structural modelling approach 2020 Hughes, David Laurie
Price of anarchy and price of stability in multi-agent project scheduling 2020 Agnetis, Alessandro
Value of information sharing in a multiple producers-distributor supply chain 2020 Liu, Changchun
Heuristics for scheduling data gathering with limited base station memory 2020 Berlińska, Joanna
A multi-objective optimization approach to project scheduling with resiliency criteria under uncertain activity duration 2020 Yeganeh, Farnaz Torabi
Modeling and solving for bi-objective cutting parallel machine scheduling problem 2020 Meng, Ronghua
A cutting plane approach for the multi-machine precedence-constrained scheduling problem 2020 Venkateshan, Prahalad
Scheduling equal length jobs with eligibility restrictions 2020 Hong, Juntaek
A mixed integer linear programming modelling for the flexible cyclic jobshop problem 2020 Quinton, Félix
Approximation algorithms for minimizing the maximum lateness and makespan on parallel machines 2020 Alhadi, Gais
Modeling and solving the multi-period disruptions scheduling problem on urban networks 2020 Coco, Amadeu A.
A worm optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times 2020 Arnaout, Jean-Paul
Solving parallel machine problems with delivery times and tardiness objectives 2020 Maecker, Söhnke
A new approximation algorithm for unrelated parallel machine scheduling with release dates 2020 Pei, Zhi
A two-stage approach for the critical chain project rescheduling 2020 Zhao, Yan
Modeling single machine preemptive scheduling problems for computational efficiency 2020 Jaramillo, Fernando
Scheduling a forge with due dates and die deterioration 2020 Ősz, Olivér
Alle Artikel auflisten